Skip To Main Content
Hart

 Hart Elementary School Facilities Projects

(Updated February 2024)

Project in Process:

Anticipated Start Date

Impact of Project

Mechanical repairs Summer 2023 Work is related to improved air quality and circulation (AC/Heat/Circulation system)
Exterior facade repair Summer 2023 Work related to ongoing maintenance and prevention of water intrusion.
Additional security cameras Spring 2024 Prioritizing the safety and well-being of our students, staff and facilities, four new security cameras (2 interior/2 exterior) are being added.
Front security vestibule* Spring 2024 Piroritizing the safety and well-being of our students, staff and facilities, a secure entrance area is beign created. This project is a capital project which is eligible for state funding. The state reimbursement request is being submitted in August 2023.
Boiler Replacement Fall 2023 Replacing Unrepairable Sectional Boiler with Two High Efficiency Boilers
Electronic door control for exterior doors* Summer 2024 Prioritizing the safety and well-being of our students, staff and facilities, keyless entry solutions are being added to all school facilities as part of our district-wide adoption of integrated security systems.
Heat Exchanger replacement     Spring 2024     This project will replace an existing heat exchanger which is at the end of its useful life.
Domestic Hot Water Tank Replacement   Spring 2024   The DHW system at the school is at the end of it's usefull life and will be replaced as part of this project.
     

Completed Projects:

major summer cleaning Summer 2023 Over the summer all school buildings underwent their major summer cleaning (deep clean of all major educational spaces - furniture and fixtures are removed from all classrooms, the floors/walls are deep cleaned and then the roos are restaged).
Floor stripped and waxed Summer 2023 Stripping and refinishing is the process of removing old layers of wax and dirt, restoring the floors to a like-new appearance and protecting it from future damage.
Front entrance Summer 2023 Repaved front walkway and ADA ramp
Floor repair Summer 2023 From time to time, restorative floor care is needed to help restore the floors and prevent any permanent damage.
Converted two underutilized offices into a new classroom. Summer 2023  
Replaced main office paging system Summer 2023  
     

Grounds Related Projects:

Walking path Summer 2023 The City of Stamford has established a walking path that creates a natural greenway from the West Side to Downtown. The path is accessible from Hart grounds.
Containers Summer 2023/Fall 2023 Containers are being removed or replaced with newer equipment owned by SPS. Containers are used for on-site storage of furniture and equipment.
     
*Denotes a Capital Project managed by the City