(Updated February 2024)

Project in Process:

Anticipated Start Date

Impact of Project

Additional security cameras Spring 2024 Prioritizing the safety and well-being of our students, staff and facilities, four new security cameras (2 interior/2 exterior) are being added.
Electronic door control for exterior doors* Summer 2024 Prioritizing the safety and well-being of our students, staff and facilities, keyless entry solutions are being added to all school facilities as part of our district-wide adoption of integrated security systems.
DHW Replacement     Summer 2024     Replace Domestic Hot Water System
     

Completed Projects:

Active Touch Panel Install Summer 2023 Install 20 active touch panels in classroom to replace Promethean boards. Project conducted for IT.
Painting Project Spring/Summer 2023 Building wide painting.
Window air-conditioning Summer 2023 Work is related to improved air quality and circulation (AC/Heat/Circulation system)
Major summer cleaning Summer 2023 Over the summer all school buildings underwent their major summer cleaning (deep clean of all major educational spaces - furniture and fixtures are removed from all classrooms, the floors/walls are deep cleaned and then the rooms are restaged).
Floor stripped and waxed Summer 2023 Stripping and refinishing is the process of removing old layers of wax and dirt, restoring the floors to a like-new appearance and protecting it from future damage.
     

Grounds Related Projects:

     