Davenport Ridge Elementary School Facilities Projects(Updated February 2024) |
||
Project in Process: |
Anticipated Start Date |
Impact of Project |
Additional security cameras | Spring 2024 | Prioritizing the safety and well-being of our students, staff and facilities, four new security cameras (2 interior/2 exterior) are being added. |
Electronic door control for exterior doors* | Summer 2024 | Prioritizing the safety and well-being of our students, staff and facilities, keyless entry solutions are being added to all school facilities as part of our district-wide adoption of integrated security systems. |
Roof replacement* | Summer 2024 | A roof replacement is a capital project which is eligible for state funding. The state reimbursement request is being submitted in August 2023. |
Phase 1 of Bathroom replacements* | Summer 2024 | Bathroom replacements are a capital project which is eligible for state funding. The state reimbursement request has been submitted and SPS is awaiting approval to move forward with the work. |
Fiber duct replacement | Summer 2024 | This project involves the removal of existing and original fiber ductwork which is deteriorating and in need of replacement. This ductwork represents approximately 20% of the total ductwork within the building. This project will be funded through ESSER III. |
Completed Projects: |
||
major summer cleaning | Summer 2023 | Over the summer all school buildings underwent their major summer cleaning (deep clean of all major educational spaces - furniture and fixtures are removed from all classrooms, the floors/walls are deep cleaned and then the roos are restaged). |
Floor stripped and waxed | Summer 2023 | Stripping and refinishing is the process of removing old layers of wax and dirt, restoring the floors to a like-new appearance and protecting it from future damage. |
Grounds Related Projects: |
||
Perimeter | Ongoing | SPS has engaged a site contractor to clear away overgrowth / weed / poison ivy / etc. along the perimeter of the school property. |
Baseball and Open Field | Ongoing | School grounds were added to the district-wide organic lawn maintenance program which includes regular aeration and fertilization. |
Containers | Summer 2023 | Trailers are being removed or replaced with newer equipment owned by SPS. Trailers are used for on-site storage of furniture and equipment. |
Playgrounds | Ongoing | All mulched playgrounds are weeded every two weeks. |
*Denotes a Capital Project managed by the City |