Skip To Main Content
AITEexterior

AITE Facilities Projects

(Updated February 2024)

Mechanical, Electrical, and Plumbing (MEP) Improvements     Summer 2024     ESSER funding to commence and complete an investment in mechanical, electrical, and plumbing (MEP) systems improvements at AITE. 
Repairs to air handler unit Fall 2023 Work is related to improved air quality and circulation (AC/Heat/Circulation system)
Creating additional office space Winter 2023/24 NEED DESCRIPTION FROM ADMIN
Electronic door control for exterior doors* Summer 2024 Prioritizing the safety and well-being of our students, staff and facilities, keyless entry solutions are being added to all school facilities as part of our district-wide adoption of integrated security systems.
Replace chiller and cooling tower* Summer 2024 Work is related to improved air quality and circulation (AC/Heat/Circulation system)

Project in Process:

Anticipated Start Date

Impact of Project

Repairs to air handler unit Fall 2023 Work is related to improved air quality and circulation (AC/Heat/Circulation system)
Creating additional office space Winter 2023/24  
Electronic door control for exterior doors* Summer 2024 Prioritizing the safety and well-being of our students, staff and facilities, keyless entry solutions are being added to all school facilities as part of our district-wide adoption of integrated security systems.
Replace chiller and cooling tower* Summer 2024 Work is related to improved air quality and circulation (AC/Heat/Circulation system)
     

Completed Projects:

major summer cleaning Summer 2023 Over the summer all school buildings underwent their major summer cleaning (deep clean of all major educational spaces - furniture and fixtures are removed from all classrooms, the floors/walls are deep cleaned and then the roos are restaged).
Floor stripped and waxed Summer 2023 Stripping and refinishing is the process of removing old layers of wax and dirt, restoring the floors to a like-new appearance and protecting it from future damage.
Lockdown locks added to Media Center Summer 2023 Prioritizing the safety and well-being of our students, staff and facilities, special locks were added to the common areas associated with the Media Center.
     

Grounds Related Projects:

Perimeter Ongoing SPS has engaged a site contractor to clear away overgrowth/weed/poison ivy / etc. along the perimeter of the school property.
Containers Summer 2023/Fall 2023 Containers are being removed or replaced with newer equipment owned by SPS. Containers are used for on-site storage of furniture and equipment.
     
*Denotes a Capital Project managed by the City